Vacuum Former Build Part 2
I CNC’d some MDF for the vacuum table part of the build. Glued and sandwiched it all together. There is a hole at the bottom that fits the hose on our shop vac.
Table before sanding.
This entry was posted
on Thursday, October 23rd, 2014 at 1:11 pm and is filed under Uncategorized.
You can follow any responses to this entry through the RSS 2.0 feed.
Responses are currently closed, but you can trackback from your own site.